Construction technology of vertical concealed laying of anti-seepage membrane for water cutoff curtain in the open-pit coal mine

LI Wensong1 DANG Yakun2,3 ZHU Mingcheng2,3 GAO Ya2,3

(1.Dayan Company of China Energy Investment Corporation, Hulun Buir, Inner Mongolia, China 021122)
(2.Xi’an Research Institute Co., Ltd., China Coal Technology and Engineering Group Corp., Xi’an, Shaanxi Province, China 710077)
(3.Shaanxi Key Laboratory of Coal Mine Water Hazard Prevention and Control Technology, Xi’an, Shaanxi Province, China 710077)

【Abstract】Anti-seepage membrane (HDPE geomembrane) is widely used in anti-seepage projects currently that mainly prevent pollution, leakage and diffusion, and its laying form is various. In an underground water cutoff curtain project of an open-pit coal mine in China, the anti-seepage membrane was laid vertically as the main body of the water cutoff curtain wall, and the largest concealed depth was about 50 m. Groove sections were connected by connection boxes. Through the grouting and backfilling process, the impermeability of the curtain wall was improved and the anti-seepage membrane was compacted. Finally, pumping test in the surrounding wells was used to verify the impermeability of the curtain wall. The results showed that the permeability coefficient of curtain wall of anti-seepage membranes was just 8.6 × 10−7 cm/s which met the design requirements. The curtain wall of anti-seepage membranes has the advantages of high efficiency, low cost, and environmental protection. The successful application of the anti-seepage membrane to this project provides a significant reference for other similar projects.

【Keywords】 open-pit coal mine; water cutoff curtain; anti-seepage membrane; vertical concealed laying; overlapping connection; surrounding well test;

【DOI】

【Funds】 National Key R&D Program of China (2017YFC0804106)

Download this article

(Translated by HAN R)

    References

    [1] LIU Chunlei. The application of HDPE composite geomembrane in seepage control engineering [J]. Value Engineering, 2013, 30: 93–94 (in Chinese).

    [2] WANG Yufeng. Application of geosynthetics in open-pit coal mines [J]. Opencast Mining Technology, 2012 (6): 6–7 (in Chinese).

    [3] YUAN Manhong. Anti-seepage measures under different geological foundations in water conservancy foundation construction [J]. Technology and Market, 2018, 25 (8): 94–95 (in Chinese).

    [4] PAN Shaocai, LI Chunyan. The application conditions analysis and quality control points of vertical plastic coating technology [J]. Jilin Water Resources, 2007 (7): 39–40 (in Chinese).

    [5] ZHANG Deyou. The application of anti-seepage curtain in dike reinforcement [J]. Zhi Huai, 2016 (7): 23–24 (in Chinese).

    [6] YAO Youchao, BAO Zhongwei. Application of vertical cut-off curtain to sanitary landfill site in plain areas [J]. Environmental Engineering, 2008, 26 (3): 29–32 (in Chinese).

    [7] ZHANG Yan. New technology of cutting off seepage channel and reducing water drainage in open-pit coal mine [J]. Opencast Mining Technology, 2017, 32 (6): 45–47 (in Chinese).

    [8] ZHAO Chunhu, WANG Qiangmin, WANG Hao, et al. Analysis of influence of open-pit coal mining on groundwater system and curtain wall protection in grassland area of northeastern China [J]. Journal of China Coal Society, 2019, 44 (12): 3685–3692 (in Chinese).

    [9] ZHANG Yan, HUANG Xuanming, PENG Wei, et al. Application of water cutoff curtain in the seepage cutoff and drainage reduction of open-pit coal mine [J]. Journal of China Coal Society, 2020, 45 (5): 1865–1873 (in Chinese).

    [10] YAN Zili, ZHAO Leihua, FENG Luming, et al. Summary of construction technology and quality control of hydraulic anti-seepage composite geomembrane [J]. Yangtze River, 2018, 49 (Sup. 2): 176–181 (in Chinese).

    [11] PANG Hongwei. Application of composite geomembrane in anti-seepage engineering of artificial lake and discussion on construction technology [J]. Residence, 2018 (11): 54 (in Chinese).

    [12] ZHANG Lixin, LI Yong, NIU Jingtao, et al. “垂直铺塑防渗技术”的拓展应用技术研究 [C]//2015 水利水电地基与基础工程:中国水利学会地基与基础工程专业委员会第13次全国学术研讨会论文集. Chengdu, Sichuan: China Water Resources Press, 2015: 772–776 (in Chinese).

    [13] AI Lixin, LIN Wei, XU Mengjun, et al. Practice of impermeable wall in water control project for open pit slope [J]. Industrial Minerals & Processing, 2015 (9): 43–45 (in Chinese).

    [14] DING Hao. To investigate HDPE membrane impermeable subgrade construction technology [J]. Building Technology Development, 2017, 44 (3): 98–99 (in Chinese).

    [15] YANG Yong. Analysis on how to strengthen the quality of water stop at the joint of diaphragm wall [J]. Green Environmental Protection Building Materials, 2019 (6): 205–206 (in Chinese).

    [16] WANG Hai, HUANG Xuanming, ZHU Mingcheng, et al. Water-preserved coal mining technology in open pit based on cutoff wall with high fly ash content [J]. Journal of China Coal Society, 2020, 45 (3): 1160–1169 (in Chinese).

This Article

ISSN:1001-1986

CN: 61-1155/P

Vol 48, No. 04, Pages 68-73

August 2020

Downloads:3

Share
Article Outline

Abstract

  • 1 Project overview
  • 2 Vertical concealed laying of anti-seepage membranes
  • 3 Overlapping connection and backfill grouting
  • 4 Verification of seepage cutoff effects of anti-seepage membranes
  • 5 Conclusions
  • References