【Abstract】The sea-crossing tunnels are developing rapidly in China. The proposed Qiongzhou Strait Passage and Bohai Strait Passage will face technical difficulties such as ultra-long distance and ultra-high water pressure tunneling. In the current research and practice, the water pressure of shield tunneling is about 0.8 MPa, and the distance of one tunneling is within 8 km. Based on the engineering background of the Qiongzhou Strait Middle Line Shield Tunnel(water pressure of 1.2 MPa, tunneling length of 12 km), the engineering analogy and construction key technologies are used to analyze the feasibility of high-pressure long-distance shield tunneling technology to solve the problem of safe tunneling and safe service during the operation of the shield tunnel under high water pressure. The following technologies, i. e., shield active tool change, passive saturation diving belt pressure tool change, integrated tool change technology for freezing and strengthening in extraordinary state and the comprehensive technology of replaceable seal, are put forward, which can guarantee the shield tunneling for long distance. Meanwhile, an ultra-high water pressure shield composite segment lining and a combination of internal and external waterproof structures are proposed to ensure the safe operation of the shield segment structure under ultra-high water pressure.

【Keywords】 subsea tunnel; high water pressure; shield tunnel; long distance tunneling; cutting tool replacement;

【DOI】

【Funds】 Research Plan of National Railway Administration of the People's Republic of China (KF2015-005-B) Project of Science and Technology Research and Development Program of China Railway Corporation (2016-Major-08)

Download this article

    References

    [1] WANG Mengshu. Tunnel and underground engineering technology in China [M]. Beijing: China Communications Press, 2010.

    [2] LI Yan, MU Huansen. The channel tunnel: Construction process and innovation experiences [J]. Journal of Engineering Studies, 2009, 1 (1): 90.

    [3] WANG Mengshu. Tunneling by TBM/shield in China: State-of-art, problems and proposals [J]. Tunnel Construction, 2014, 34 (3): 179.

    [4] LI Guangyao. Technology for slurry shield to passing through up-soft-down-hard stratum in construction of Shiziyang Tunnel [J]. Railway Standard Design, 2010, 54 (11): 89.

    [5] SONG Chaoye, HE Weiguo. Key technology of sea-crossing interval tunnel in complex environment design of Xiamen rail transit line 3 [J]. Tunnel Construction, 2018, 38 (3): 414.

    [6] SONG Chaoye, HE Weiguo, LIU Peng. Construction method analysis of long subway subsea tunnel in hard rock stratum [J]. Construction Technology, 2018, 47 (8): 69.

    [7] LI Xue, ZHOU Shunhua, GONG Quanmei, et al. Evaluation of earth pressure around a deeply buried metro shield tunnel with a large cross-section under high water pressure conditions [J]. Rock and Soil Mechanics, 2015, 36 (5): 1415.

    [8] YAN Qixiang, WANG Chunyan, ZHENG Daijing, et al. Conformation design and statistical analysis of large underwater shield tunnel [J]. Railway Standard Design, 2016, 60 (2): 99.

    [9] ZHAO Ming, DING Wenqi, PENG Yicheng, et al. Experimental study on the reliability of shield tunnel segment joints to remain watertight under high water pressure [J]. Modern Tunnelling Technology, 2013, 50 (3): 87.

    [10] ZHENG Yonglai, FENG Lipo, DENG Shuxin, et al. Study on upper-bound limit method of face stability of shield tunnel with high-water pressure [J]. Journal of Tongji University (Natural Science), 2013, 41 (8): 1179.

    [11] XU Liming, YANG Yandong, ZHOU Jianjun, et al. Prediction of disc cutter wear and replacement of shield used in sea-crossing section of Xiamen rail transit line No. 2 [J]. Tunnel Construction, 2016, 36 (11): 1379.

    [12] WANG Mengshu. Current developments and technical issues of underwater traffic tunnel-discussion on construction scheme of Taiwan strait undersea railway tunnel [J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27 (11): 2161.

    [13] ZHANG Yueling. Proposal selection of planning programs for Bohai strait tunnel [J]. Railway Economics Research, 2013 (1): 12.

    [14] JIANG Chao. Summary of design of Shiziyang Tunnel on Foshan-Dongguan intercity railway [J]. Tunnel Construction, 2017, 37 (2): 207.

    [15] SONG Chaoye, ZHOU Shuming, TAN Zhiwen. Discussion on calculation of hydraulic load upon subsea tunnel lining [J]. Modern Tunnelling Technology, 2008, 45 (S): 134.

This Article

ISSN:2096-4498

CN: 44-1745/U

Vol 40, No. 05, Pages 717-726

May 2020

Downloads:9

Share
Article Outline

Abstract

  • 0 Introduction
  • 1 Qiongzhou Strait Railway Tunnel
  • 2 Case study on shield tunnels under highwater pressure
  • 3 Countermeasures for construction of shield-bored tunnels under high waterpressure
  • 4 Segment structure to cope with high waterpressure
  • 5 Conclusions and recommendations
  • References