Statistics on Large-diameter (over 9 m) Rock Tunnel Boring Machine Worldwide

Download this article

    Footnote

    [1]. Note: The data are from some large-diameter rock TBM manufactures and public literatures and documents, which might not include all. [^Back]

    References

    [1] LI Xiangpu. Opinions on some issues concerning the construction of Tianshengqiao Secondary Hydropower Station [J]. Guizhou Water Power, 1995, 23 (4): 1.

    [2] BURGER W, DUDOUIT F. The Hallandsas dual mode TBM [C]//Proceedings of 2009 Rapid Excavation and Tunneling Conference. Littleton: Soc. of Mining, Metallurgy and Exploration, 2009: 416 (22): 416.

    [3] LENG Yaodong, XIE Yushan. TBM construction method for main tunnel of Xueshan Tunnel in Taiwan [J]. Tunnel Construction, 2007, 27 (S2): 542.

    [4] Exploring the world’s longest railway tunnel: Lessons learned from the Gotha Baseline Tunnel Project [EB/OL]. (2019-06-06) [2020-08-28]. https://www.sohu.com/a/319098717_658576.

    [5] Perschling [EB/OL]. [2020-08-28]. https://www.herrenknecht.com/cn/suche/?tx_solr%5Bq%5D=Perschling.

    [6] ACCIONA construction receives award for Pajares Tunnels lining [EB/OL]. (2017-03-20)[2020-08-28]. https:/ /tunnelingonline.com/acciona-award-pajares-tunnel-lining/.

    [7] Pajares Lot 4 Tunnel [EB/OL]. (2017-05-31) [2020-08-28]. https://www.therobbinscompany.com/zh-hans/project-category/single-shield-tbm-zh-hans/.

    [8] Tunnel du Mont Sion [EB/OL]. [2020-08-28]. https://www.herrenknecht.com/en/references/referencesdetail/tunnel-du-mont-sion/.

    [9] End of tunneling at Mont Sion [EB/OL]. [2020-08-28]. https://tunnelbuilder.com/News/End-of-Tunnelling-at-Mont-Sion.aspx.

    [10] Accounting for slow progress at Niagara [EB/OL]. [2020-08-28]. https://www.tunneltalk.com/Accounting-for-slow-progress-atNiagara.php.

    [11] The Niagara Tunnel project [EB/OL]. [2020-08-28]. https://www.therobbinscompany.com/projects/niagara-tunnel-project/.

    [12] Cabrera [EB/OL]. [2020-08-28]. https://www.herrenknecht.com/cn/referenzen/referenzendetail/cabrera/.

    [13] ORTU M, GIACOMIN G. Tunneling on legacy way project [C]//Proceedings of the World Tunnel Congress 2014. [S. l. ]: ITA-AITS, 2014: 1.

    [14] Tunnel de Bure [EB/OL]. [2020-08-28]. https://www.herrenknecht.com/cn/referenzen/referenzendetail/tunnel-de-bure/.

    [15] MERLINI D, STOCKER D, FALANESCA M, et al. The Ceneri Base Tunnel: construction experience with the Southern portion of the Flat Railway Line crossing the Swiss Alps [J]. Engineering, 2018, 4 (2): 235.

    [16] World’s longest tunnel project ever: AMR Water Tunnel [EB/OL]. [2020-08-28]. https://www.therobbinscompany.com/zh-hans/projects/alimineti-madhava-reddy-amr/.

    [17] WALLIS S. Robbins leads India’s reintroduction to mega-TBM advantages at AMR [EB/OL]. [2020-08-28]. https://www.tunneltalk.com/AMR-India-Project.php.

    [18] LI Weiguo, KONG Fanbin. TBM Construction of diversion tunnel of Jinping Ⅱ Hydropower Station [J]. Sichuan Water Power, 2015, 34 (S2): 5.

    [19] ZHOU Jifang, CAO Xionghui, ZHOU Chunhong. Study of TBM construction of diversion tunnel for Jinping Ⅱ Hydropower Station [J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 30 (1): 149.

    [20] Nant DE Drance Pumped Storage Power Station, Switzerland [EB/ OL]. [2020-08-28]. https://www.herrenknecht.com/cn referenzen/referenzendetail/nant-de-drance/.

    [21] Pula Subbaiah Veligonda Project, India [EB/OL]. [2020-08-28]. https://www.therobbinscompany.com/zh-hans/projects/pula-subbaiah-veligonda-project/.

    [22] YANG Mugao. West Qinling Tunnel on Lanzhou-Chongqing Railway [J]. Tunnel Construction, 2018, 38 (12): 2071.

    [23] Extreme Excavation in Fault Zones and Squeezing Ground at the Kargi HEPP in Turkey [EB/OL]. (2015-05-22) [2020-08-28]. https://www.therobbinscompany.com/zh-hans/kargi/.

    [24] Sochi Road Tunnel No. 3, Russia [EB/OL]. [2020-08-28]. https://www.therobbinscompany.com/zh-hans/projects/sochicomplex-3/.

    [25] BILGIN N. Mechanized tunneling in the influence zone of North Anatolian and East Anatolian Faults [EB/OL]. (2017-05-18) [2020-08-28]. https://ethz.ch/content/dam/ethz/special-interest/baug/igt/tunneling-dam/kolloquien/2017/31_Bilgin.pdf.

    [26] CLARK J. Challenging mixed face tunneling at India’s Sleemanabad Carrier Canal [C]//Tunnels and Underground Cities: Engineering and Innovation meet Archaeology. London: Taylor & Francis Group, 2019: 3605.

    [27] TBM of Tibet Paimo highway project completed excavation task ahead of schedule [EB/OL]. (2017-08-29) [2020-08-28]. http://news. jstv.com/a/20170829/1503979842112.shtml.

    [28] TBM returns to Norway, Ulriken rail crossing tunnel will be completed soon [EB/OL]. (2017-07-12)[2020-08-28]. https://www.sohu.com/a/156605799_658576.

    [29] How can TBM overcome the “world’s hardest rock layer” after the completion of the follo line, the largest infrastructure project in northern Europe [EB/OL]. (2019-03-06) [2020-08-28]. https://www.sohu.com/a/299562723_658576.

    [30] RAMONI M, GALLUS R, ITEN R. The new Bözberg Tunnel (Switzerland): Risk management and auxiliary measures for the TBMbreak-through [C]//Tunnels and Underground Cities: Engineering and Innovation meet Archaeology. London: Taylor & Francis Group, 2019: 4574.

    [31] THOMAS T. Belchen breakthrough [EB/OL]. (2017-07-17) [2020-08-28]. https://tunnellingjournal.com/belchenbreakthrough/.

    [32] Bolaños boring complete on Spanish high-speed line [EB/OL]. (2017-01-19) [2020-08-28]. https://www.tunneltalk.com/Spain-Jan2017-FCC-completes-boring-of-Bola%C3%B1os-tunnels-for-Madrid-Galicia-high-speed-rail-in-Spain.php.

    [33] Robins large diameter cross model roadheader: braver’s game in Russia [EB/OL]. (2019-08-14) [2020-08-28]. https://www.sohu.com/a/333543815_823383.

    [34] Tunnel Achievement Award: Ohio Canal Interceptor Tunnel [EB/OL]. (2019-08-14) [2020-08-28]. https://tunnelingonline.com/tunnel-achievement-award-ohio-canal-interceptor-tunnel/.

    [35] Change the cutter head diameter underground! Double diameter TBM will be used in Dezhou drainage tunnel project [EB/OL]. (2019-11-08) [2020-08-28]. https://www.sohu.com/a/352533442_658576.

This Article

ISSN:2096-4498

CN: 44-1745/U

Vol 40, No. 09, Pages 1379-1390

September 2020

Downloads:0