Home > Journals > Tunnel Construction >Issue 04,2020
Tunnel Construction
Translated from the Chinese edition
Supervisor(s): China Railway Tunnel Group Co.Ltd.
Sponsor(s): China Railway Tunnel Consultants Co.,Ltd.
CN:44-1745/U

12 issues per year

Current Issue: Issue 04, 2020  

Total Downloads:150

  • Tunnel Construction was hosted by China Railway Tunnel Consultants Co.,Ltd. It mainly publishes research results and advanced technologies in tunnels and underground engineering and related fields; the content of the publication is based on practical technology, taking into account experiments, research and comprehensive reviews, designing tunnels and underground works in railways and highways, and related institutional projects, Water conservancy projects, geotechnical engineering, engineering blasting, engineering materials, engineering machinery, engineering management and other majors. Domestic and international scientific and technological information and industry trends in related fields.

  • Editor-in-Chief:Hong Kairong

Key Construction Technologies for Immersed Tunnel of Shenzhen-Zhongshan Link

CHEN Yue;CHEN Weile;SONG Shenyou;LIU Jian;JIN Wenliang

Tunnel Construction,2020,Vol 40,No. 04

Plan and Practice of Intelligent Construction System of Steel-Concrete-Steel Composite Immersed Tunnel of Shenzhen-Zhongshan Link

CHEN Weile;SONG Shenyou;JIN Wenliang;XIA Fengyong

Tunnel Construction,2020,Vol 40,No. 04

Application of Pipe-roofing Method with Various Section Types in Metro Construction of Guiqiao Road Station at Saturated Soft Soil Area

ZHU Yanfei;GUO Yan;PAN Weiqiang;ZHAO Xiaopeng

Tunnel Construction,2020,Vol 40,No. 04