Home > Journals > Tunnel Construction >Issue 05,2018
Tunnel Construction
Translated from the Chinese edition
Supervisor(s): China Railway Tunnel Group Co.Ltd.
Sponsor(s): China Railway Tunnel Consultants Co.,Ltd.
ISSN:2096-4498 CN:41-1448/U

12 issues per year

Current Issue: Issue 05, 2018  

Total Downloads:2

  • Tunnel Construction was hosted by China Railway Tunnel Consultants Co.,Ltd. It mainly publishes research results and advanced technologies in tunnels and underground engineering and related fields; the content of the publication is based on practical technology, taking into account experiments, research and comprehensive reviews, designing tunnels and underground works in railways and highways, and related institutional projects, Water conservancy projects, geotechnical engineering, engineering blasting, engineering materials, engineering machinery, engineering management and other majors. Domestic and international scientific and technological information and industry trends in related fields.

  • Editor-in-Chief:Hong Kairong

Distribution Laws of Fire Temperature Fields in Immersed Tunnel: A Case Study of Hong Kong-Zhuhai-Macao Bridge Immersed Tunnel Project

JIANG Shuping;TIAN Kun;XU Pai

Tunnel Construction,2018,Vol 38,No. 05